CONTROL OF AND IMPROVEMENT IN THE PRODUCTION OF PNEUMATIC-TYRED LOADING SHOVELS
CONTROL Y MEJORA DE LA PRODUCCION DE PALAS CARGADORAS DE NEUMATICOS
DETAILS ARE GIVEN OF A METHOD FOR THE CONTROL AND IMPROVEMENT OF THE PRODUCTION OF PNEUMATIC-TYRED LOADING SHOVELS, WHICH IS BASED ON THE USE OF A CHART AND ON THE CONSIDERATION OF THE FOLLOWING FACTORS: FILLING, AVERAGE NUMBER OF CYCLES OF THE LOADING SHOVEL IN ONE HOUR AND GIVEN CAPACITY OF THE SKIP (ACCORDING TO SAE STANDARD). A PRACTICAL EXAMPLE IS GIVEN OF A LOADING SHOVEL WITH A SKIP OF 8 CUBIC METRES CAPACITY, LOADING BLASTED ROCK, EACH SKIP BEING FILLED AT 88% OF THE GIVEN CAPACITY. RECOMMENDATIONS ARE PUT FORWARD TO GENERALIZE THE METHOD BY APPLYING IT TO TRANSPORT VEHICLES.
-
Authors:
- GARCIA-OVEJERO, R
- Publication Date: 1977-2
Media Info
- Pagination: 9-12
-
Serial:
- Rocas Y Minerales
- Issue Number: 62
- Publisher: Editorial Rocas y Minerales
Subject/Index Terms
- TRT Terms: Charts; Computer programming languages; Earthwork; Excavating equipment; Methodology; Process control; Rocks; Tires
- Uncontrolled Terms: Efficiency
- ITRD Terms: 6486: Chart; 3653: Earthworks; 5911: Efficiency; 3680: Excavator; 9102: Method; 8669: Process control; 4154: Rock; 1381: Tyre
- Subject Areas: Geotechnology; Vehicles and Equipment; I10: Economics and Administration;
Filing Info
- Accession Number: 01293891
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 21 2010 4:21AM