COMMISSION IV. DOCUMENT NO 147 : PROGRESS REPORT ON THE BEHAVIOUR OF A CONCRETE PAVEMENT AND WIDENING OF AN EXISTING CONCRETE CARRIAGEWAY; CENTENARY ROUTE, SECTION 2

COMISION IV. DOCUMENTO N.147: INFORME PROGRESIVO SOBRE EL COMPORTAMIENTO DE UN RECUBRIMIENTO Y ENSANCHE DE HORMIGON SOBRE UNA CALZADA DE HORMIGON EXISTENTE CAMINO CENTENARIO II TRAMO

THIS WORK IS A PROGRESS REPORT ON THE BEHAVIOUR OF AN EXPERIMENTAL CONCRETE SECTION WHICH WAS WIDENED AND SURFACED ON THE SECOND SECTION OF THE CENTENARY ROUTE, BETWEEN KMS 8378 AND 9052. IT REPORTS FAVOURABLE RESULTS, CONFORMING TO DATA FOUND IN THE EXISTING LITERATURE. FOR THE COVERING ABSTRACT SEE IRRD ABSTRACT NO 106370, AND 106374, 106456-90.

  • Authors:
    • AUBERT, M
  • Publication Date: 1972-12

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01293840
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 4:20AM