FOURTH FOOTBRIDGE IN SALZBURG
VIERTER FUSSGAENGERSTEG IN SALZBURG
A THREE SPAN DESIGN WITH SPANS OF 27 M, 46 M AND 27 M TOTALLING 100 M PROVED ITSELF, IN SPITE OF THE DEEP FOUNDATIONS NECESSARY FOR THE PIERS, AS THE MOST ECONOMICAL SOLUTION. THE END SPANS OF THE ARCHED T-BEAMS WERE CONSTRUCTED ON FALSEWORK, THE CENTRAL SPAN BY THE CANTILEVER METHOD. THE ROUND COLUMNS ARE CONTINUED UNDER THE BED OF THE RIVER AS LARGE DIAMETER BORED PILES. THE 35 M LONG RAMP CONSISTS OF SINGLE SPAN SLABS. GREAT ATTENTION WAS PAID TO THE DESIGN OF THE STRUCTURE.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/05142946
-
Authors:
- KARGEL, E
- Publication Date: 1978
Language
- German
Media Info
- Pagination: 30-2
-
Serial:
- ZEM U BETON
- Volume: 23
- Issue Number: 1
- ISSN: 0514-2946
Subject/Index Terms
- TRT Terms: Beams; Bridge piers; Bridges; Cast in place concrete; Construction; Falsework; Footbridges; Formwork; Foundations; Slabs; Support piles
- Uncontrolled Terms: Construction with movable formwork
- Geographic Terms: Austria
- ITRD Terms: 8007: Austria; 3472: Beam; 3455: Bridge; 3434: Bridge pier; 4781: Cast in situ concrete; 3413: Construction with movable formwork; 3423: Falsework (bridge); 3475: Footbridge; 3377: Foundation; 3399: Pile; 3491: Slab
- Subject Areas: Bridges and other structures; Construction; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;