FOURTH FOOTBRIDGE IN SALZBURG

VIERTER FUSSGAENGERSTEG IN SALZBURG

A THREE SPAN DESIGN WITH SPANS OF 27 M, 46 M AND 27 M TOTALLING 100 M PROVED ITSELF, IN SPITE OF THE DEEP FOUNDATIONS NECESSARY FOR THE PIERS, AS THE MOST ECONOMICAL SOLUTION. THE END SPANS OF THE ARCHED T-BEAMS WERE CONSTRUCTED ON FALSEWORK, THE CENTRAL SPAN BY THE CANTILEVER METHOD. THE ROUND COLUMNS ARE CONTINUED UNDER THE BED OF THE RIVER AS LARGE DIAMETER BORED PILES. THE 35 M LONG RAMP CONSISTS OF SINGLE SPAN SLABS. GREAT ATTENTION WAS PAID TO THE DESIGN OF THE STRUCTURE.

Language

  • German

Media Info

  • Pagination: 30-2
  • Serial:
    • ZEM U BETON
    • Volume: 23
    • Issue Number: 1
    • ISSN: 0514-2946

Subject/Index Terms

Filing Info

  • Accession Number: 01292876
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Files: ITRD
  • Created Date: Nov 21 2010 3:44AM