LA GALERIE EDF DE BELLEDONNE OU 18200 METRES SANS FENETRE - CREUSEMENT PAR LA METHODE TRADITIONNELLE ET CREUSEMENT PAR TUNNELIER
CONFERENCE PRESENTEE AUX JOURNEES TECHNIQUES DE LA SECTION MINE DE LA SIM, A BIARRITZ, 10-14 MAI 1977. L'AUTEUR PRESENTE L'EXECUTION DE L'OUVRAGE QUI A ETE PARTAGEE EN DEUX LOTS : 1) POUR LE LOT AMONT, LA METHODE DE PERFORATION EST TRADITIONNELLE AVEC TIR A L'EXPLOSIF ; 2) POUR LE LOT AVAL LE DEROCHEMENT EST FAIT AU TUNNELIER. IL DONNE POUR LES 2 LOTS DES INDICATIONS SUR LES VITESSES D'AVANCEMENT EN BON ET EN MAUVAIS TERRAINS ET LES PHENOMENES DE DECOMPRESSION ET LES MOYENS UTILISES POUR Y REMEDIER; IL TRAITE ENFIN DES AVANTAGES ET DES INCONVENIENTS DU TUNNELIER A ATTAQUE GLOBALE TELS QUE : RAPIDITE DE CREUSEMENT, REDUCTION DU SOUTENEMENT ET DES REVETEMENTS DE BETON, AMELIORATION DES CONDITIONS DE TRAVAIL ; PRIX D'ACHAT, PRIX DES OUTILS, MANQUE DE SOUPLESSE.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03678989
-
Authors:
- Crodel, R
- Publication Date: 1978
Language
- French
Media Info
- Pagination: 65-8
-
Serial:
- IND MINER MINE
- Issue Number: 2-78
- ISSN: 0367-8989
Subject/Index Terms
- TRT Terms: Conferences; Decompression; Drilling; Equipment; Falsework; Lattices; Presplitting (Blasting); Shielding (Tunneling); Speed; Tunnels
- Geographic Terms: France
- ITRD Terms: 3394: Avancement au bouclier; BOULON D'ANCRAGE ; 3423: Cintre; 5768: Decompression; 3674: Equipement; 3871: Forage (processus); 8036: France; 3374: Galerie; 8525: Journees; 3383: Machine a attaque globale; 5188: Sautage; 3463: Treillis; 5408: Vitesse
- Subject Areas: Bridges and other structures; I54: Construction of Tunnels;
Filing Info
- Accession Number: 01291135
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 21 2010 2:30AM