TASKS AND ORGANISATION, ROAD MAINTENANCE 1
AUFGABEN UND ORGANISATION; STRASSENINSTANDHALTUNG 1
IN THIS TEXTBOOK THE PLANNING OF PERSONNEL AND PLANT CAPACITIES ARE TREATED FOR ROAD MAINTENANCE PURPOSES IN THE GERMAN DEMOCRATIC REPUBLIC BASED ON ECONOMIC CRITERIA FOR PAVEMENT AND GULLEYS. AMONGST ITEMS UNDER DISCUSSION ARE ORGANISATIONAL MATTERS ON THE STRUCTURE OF SITE REQUIREMENTS FOR THE VARIOUS ORGANISATIONAL UNITS OF ROAD WORKS OFFICES, WINTER AUXILIARY SERVICES, WORKS DEPOTS AND BRIDGE WORKS OFFICES. THE BASIS FOR PERSONNEL AND PLANT CAPACITIES IS A CERTAIN CYCLIC SYSTEM FOR THE NECESSARY UNIT TASKS (E.G. EXCHANGING TRAFFIC SIGNS, TRENCH EXCAVATIONS AND GRASS CUTTING). THE YEARLY TOTAL WORK OF EACH ROAD WORKS UNIT IS CALCULATED FROM THE VOLUME OF THE ROADS UNDER MAINTENANCE INCLUDING ANCILLARY WORKS AND EQUIPMENT WHICH IS MULTIPLIED BY THE YEARLY FACTOR DERIVED FROM THE CYCLE FACTOR. WITH THE AID OF SO CALLED MODEL AND WORKS TECHNOLOGIES OUTPUT ESTIMATES ARE MADE FOR PERSONNEL AND PLANT UTILIZATION. THE REQUIRED NUMBER OF WORK PEOPLE AND MACHINERY FOR A ROAD WORKS UNIT IS THEN CALCULATED FROM THE LEVEL OF WORK AND THE OUTPUT CAPACITIES. ACCORDINGLY, IN THE GERMAN DEMOCRATIC REPUBLIC A MAXIMUM OF 450 WORK PEOPLE ARE REQUIRED FOR MAINTAINING 3600 KM OF ROADS. WITH THE AID OF OPERATIONAL COST CALCULATIONS IT IS POSSIBLE TO CARRY OUT COST COMPARISONS BETWEEN VARIOUS ROAD WORKS UNITS. A COST ALLOCATION PROCESS COLLECTS THE PREPARED COSTS ACCORDING TO TYPE AND LOCATION AND DEBITS THEM TO THOSE MATERIALS AND WORK WHICH HAVE CAUSED THEM. THE STRUCTURE OF THE COST ALLOCATION PROCESS IS CARRIED OUT IN LINE WITH THE CALCULATION AND IN ACCORDANCE WITH THE COST ALLOCATION OF ROAD MAINTENANCE OUTPUTS. NUMEROUS MODELS AND EXAMPLES UNDERLINE THE QUESTIONS OF INTEREST ON PLANNING OF OUTPUTS AND CAPACITIES FOR ROAD MAINTENANCE PURPOSES.
-
Corporate Authors:
TRANSPRESS VERLAG FUER VERKEHRSWESEN
POSTFACH 12 35
BERLIN, Germany DDR-1080 -
Authors:
- SCHMIDT, H
- FRANKE, J
- Bartz, R
- Publication Date: 1978
Language
- German
Media Info
- Pagination: 168P
Subject/Index Terms
- TRT Terms: Calculation; Costs; Equipment; Intermodal terminals; Maintenance; Personnel; Planning; Textbooks; Winter maintenance
- ITRD Terms: 6464: Calculation; 224: Cost; 1041: Depot (transp); 3674: Equipment; GERMANY, DEMOCRATIC REPUBLIC O ; 3847: Maintenance; 102: Personnel; 143: Planning; 8526: Textbook; 2593: Winter maintenance
- Subject Areas: Maintenance and Preservation; Planning and Forecasting; I61: Equipment and Maintenance Methods; I62: Winter Maintenance;
Filing Info
- Accession Number: 01288942
- Record Type: Publication
- Source Agency: Forschungsgesellschaft für Straßen- und Verkehrswesen (FGSV)
- Files: ITRD
- Created Date: Nov 21 2010 1:33AM