TUNNELLING ON THE NEW ROME METRO BETWEEN LARGO LOLLI ALBANI AND STAZIONE TERMINI
A DESCRIPTION IS GIVEN OF THE DESIGN AND CONSTRUCTION OF THE 10.3 KM EXTENSION TO THE UNDERGROUND RAILWAY IN ROME. THE EXTENSION CONSISTED OF 5.9 KM. OF DOUBLE-TRACK SUBSURFACE RAILWAY LINE, CONSTRUCTED BY THE CUT-AND-COVER METHOD, AND 4.4 KM. OF TWO SINGLE-TRACK TUNNELS EXCAVATED BY MECHANICAL SHIELDS. FOR ABOUT 2 KM., THE TUNNELS PASS THROUGH SOILS OF VOLCANIC ORIGIN, TUFF AND POZZOLANA, THEN AFTER CROSSING A TRANSITION ZONEE OF DIFFERENT LAYERS, THROUGH A ZONE OF SANDY, SILTY OR SILTY-CLAYEY STRATA KNOWN AS "MAREMMANO". DETAILS ARE INCLUDED OF THE CONSTRUCTION METHODS AND EQUIPMENT USED FOR BORING AND LINING THE TUNNELS. /TRRL/
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0041414X
-
Authors:
- Berti, P
- Pamjn, J M
- Publication Date: 1972-9
Language
- English
Media Info
- Features: Figures; Photos;
- Pagination: p. 430-5
-
Serial:
- Tunnels & Tunnelling International
- Volume: 4
- Issue Number: 5
- Publisher: Progressive Media Markets, Ltd
- ISSN: 0041-414X
Subject/Index Terms
- TRT Terms: Sand; Shields (Tunnels); Silts; Structural design; Subways; Tunnel lining; Tunneling; Tunneling machines; Tunnels; Volcanic deposits
- Uncontrolled Terms: Tunnel design
- Old TRIS Terms: Shields (Tunneling)
- Subject Areas: Bridges and other structures; Design; Highways;
Filing Info
- Accession Number: 00203910
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Files: TRIS
- Created Date: Dec 11 1973 12:00AM