COFFERDAMS FOR THE TOWN CREEK PIERS OF THE SILAS N. PEARMAN BRIDGE OVER THE COOPER RIVER, CHARLESTON, SOUTH CAROLINA

THE COFFERDAM DESIGN IS DISCUSSED FOR PIER T-2 OF THE TOWN CREEK SPANS OF THE NEW COOPER RIVER BRIDGE, COVERING THE ADVERSE SOIL CONDITIONS AT THE SITE AS WELL AS THE DESIGN ASSUMPTIONS AND PROCEDURE. MUCH OF THE PAPER IS DEVOTED TO THE INSTALLATION PROCEDURE IN WHICH THE CONTRACTOR EMPLOYED VARIOUS EXPEDIENTS TO REDUCE THE COST OF COFFERDAM CONSTRUCTION. REDUCED COSTS WERE REFLECTED IN THE BID PRICE WHICH WAS BELOW THE ENGINEERS ESTIMATE. /AUTHOR/

  • Record URL:
  • Supplemental Notes:
    • Paper sponsored by Committee on Construction Practices--Structures and presented at the 46th Annual Meeting. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
  • Authors:
    • Carle, Robert J
  • Publication Date: 1967

Media Info

  • Media Type: Digital/other
  • Features: Figures; Photos;
  • Pagination: pp 1-10
  • Monograph Title: Joint sealers, bridge materials and construction
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00214669
  • Record Type: Publication
  • Files: TRIS, TRB
  • Created Date: Jan 23 1994 12:00AM