DESIGN AND CONSTRUCTION OF NEWPORT BRIDGE

THE EAST PASSAGE CROSSING OF NARRAGANSETT BAY WAS FORESTALLED BY U.S. NAVAL OPERATIONS UNTIL 1964, WHEN A SUITABLE SITE BECAME AVAILABLE WITH THE REQUIREMENT THAT MINIMUM CLEARANCES OF 1600 FT HORIZONTAL AND 205 FT VERTICAL WERE MAINTAINED. THIS CONDITION, PLUS ESTHETIC REQUIREMENTS, DEMANDED A SUSPENSION BRIDGE. A CENTRAL GORGE IN THE ALINEMENT NECESSITATED PILE DRIGING AT GREAT DEPTHS (100 FT AND 140 FT) FOR THE MINIMUM SPAN LENGTH. HOWEVER, A LONGER MAIN SPAN LENGTH WAS FOUND MORE EXPENSIVE. ROCK WAS LOCATED A MINUS 220 FT FOR THE WEST TOWER PIER AND MINUS 432 FT FOR THE EAST, AND MODIFIED POTOMAC-TYPE FOOTINGS WERE SELECTED. PILE CUTOFF WAS ACCOMPLISHED USING A SATURATION DIVING UNIT. FOOTING FORMS WERE DESIGNED WITH VARIABLE BUOYANCY FOR CONTROLLED LOWERING. OF THE REMAINING PIERS, SOME WERE CONSTRUCTED ON PILES OR IN THE DRY; AND OTHERS ON CAISSONS DRILLED INTO ROCK, THE TECHNIQUE USED FOR THE WEST ANCHORAGE. SIGNIFICANT FEATURES OF THE BRIDGE SUPERSTRUCTURE INCLUDE SHOP-FABRICATED PARALLEL-WIRE CABLES, A UNIQUE CABLE ANCHORAGE, PLASTIC RATHER THAN WIRE CABLE WRAPPING, AND A NEW CONCRETE DECK CURING-PROTECTIVE COMPOUND. /ASCE/

  • Supplemental Notes:
    • Vol 97, No ST 11, PROC PAPER 8529, PP 2635-2651, 9 FIG
  • Authors:
    • Hedefine, A
    • Mandel, H M
  • Publication Date: 1971-11

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00209570
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Dec 20 1971 12:00AM