Transport Research International Documentation (TRID) https://trid.trb.org/ en-us Copyright © 2024. National Academy of Sciences. All rights reserved. http://blogs.law.harvard.edu/tech/rss tris-trb@nas.edu (Bill McLeod) tris-trb@nas.edu (Bill McLeod) Transport Research International Documentation (TRID) https://trid.trb.org/Images/PageHeader-wTitle.jpg https://trid.trb.org/ Going to Great Lengths: New Bridge over Ohio River Sets Record for Cable-Stayed Spans in Buckeye State https://trid.trb.org/View/1640097 Mon, 22 Jul 2019 19:58:54 GMT https://trid.trb.org/View/1640097 Micropile Bridge Substructure Replacements: Innovative Approaches to Overcoming Unique Design and Construction Challenges through the Design/Build Process https://trid.trb.org/View/1559724 Fri, 26 Oct 2018 17:15:30 GMT https://trid.trb.org/View/1559724 Damage Investigation, Strengthening, and Repair of Jilin Highway Double-Curved Arch Concrete Bridge in China https://trid.trb.org/View/1554138 Thu, 25 Oct 2018 16:42:46 GMT https://trid.trb.org/View/1554138 A new life for the "Old Bridge": Full deck replacement of historic Halifax suspension bridge is a marvel https://trid.trb.org/View/1480737 Tue, 29 Aug 2017 10:08:05 GMT https://trid.trb.org/View/1480737 Accelerated Innovation Deployment (AID) Demonstration Project: White Swan Bridge Replacement https://trid.trb.org/View/1465721 Sun, 28 May 2017 18:52:31 GMT https://trid.trb.org/View/1465721 Restoring a landmark https://trid.trb.org/View/1416625 Wed, 27 Jul 2016 09:49:31 GMT https://trid.trb.org/View/1416625 Experimental Use of Line-X® Coated Steel Pipe Piles, Clay Hill Bridge (#2157) Replacement Project over the Mousam River, Route 9/Western Avenue, Kennebunk, Maine https://trid.trb.org/View/1398939 Mon, 11 Apr 2016 09:05:51 GMT https://trid.trb.org/View/1398939 Practice makes perfect https://trid.trb.org/View/1401673 Thu, 24 Mar 2016 10:49:11 GMT https://trid.trb.org/View/1401673 Upgrading the Delair Bridge to Meet the Needs of the Future for Commerce https://trid.trb.org/View/1350757 Mon, 27 Apr 2015 17:10:19 GMT https://trid.trb.org/View/1350757 Original copy https://trid.trb.org/View/1320885 Wed, 27 Aug 2014 10:47:09 GMT https://trid.trb.org/View/1320885 Analysis and Design for Replacement of the Burns Bridge https://trid.trb.org/View/1305466 Tue, 22 Apr 2014 16:07:31 GMT https://trid.trb.org/View/1305466 Measurement of Ground Motion near Piles during Driving https://trid.trb.org/View/1303770 Tue, 22 Apr 2014 16:07:12 GMT https://trid.trb.org/View/1303770 Deck Replacement of the Angus L. Macdonald Suspension Bridge https://trid.trb.org/View/1305462 Tue, 22 Apr 2014 16:07:06 GMT https://trid.trb.org/View/1305462 Spreadsheet Method of Forecasting the Cost of Sustaining a Set of Bridge Connections https://trid.trb.org/View/1287374 Fri, 21 Feb 2014 15:16:34 GMT https://trid.trb.org/View/1287374 Lessons Learned: Implementing Context Sensitive and Sustainable Solutions in the Oregon State Bridge Delivery Program https://trid.trb.org/View/1275592 Wed, 04 Dec 2013 16:48:06 GMT https://trid.trb.org/View/1275592