Transport Research International Documentation (TRID) https://trid.trb.org/ en-us Copyright © 2024. National Academy of Sciences. All rights reserved. http://blogs.law.harvard.edu/tech/rss tris-trb@nas.edu (Bill McLeod) tris-trb@nas.edu (Bill McLeod) Transport Research International Documentation (TRID) https://trid.trb.org/Images/PageHeader-wTitle.jpg https://trid.trb.org/ GPS AND GIS INTEGRATION IN CABLE LAYING APPLICATIONS https://trid.trb.org/View/480190 Thu, 27 Mar 1997 00:00:00 GMT https://trid.trb.org/View/480190 TRANSIENT BEHAVIOUR OF TOWED MARINE CABLES IN TWO DIMENSIONS https://trid.trb.org/View/467458 Mon, 04 Nov 1996 00:00:00 GMT https://trid.trb.org/View/467458 THE TRANSIENT BEHAVIOUR OF MARINE CABLES BEING LAID - THE TWO- DIMENSIONAL PROBLEM https://trid.trb.org/View/467460 Mon, 04 Nov 1996 00:00:00 GMT https://trid.trb.org/View/467460 SOVEREIGN, C.S. CABLE LAYING AND REPAIR SHIP https://trid.trb.org/View/440136 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/440136 TENEO; CABLE LAYER https://trid.trb.org/View/444901 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/444901 SHIP-OF-OPPORTUNITY MARINE CABLE INSTALLATION https://trid.trb.org/View/446285 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/446285 ON THE INFLUENCE OF CURVATURE ON THE MECHANICAL BEHAVIOUR OF MARINE CABLES DURING DEPLOYMENT https://trid.trb.org/View/449811 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/449811 SIMULATION OF TENSION CONTROLLED CABLE DEPLOYMENT https://trid.trb.org/View/437888 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/437888 DISCOVERY - VERSATILE OFFSHORE SUPPORT VESSEL AND CABLE LAYER COMPLETED BY BOELWERF https://trid.trb.org/View/438155 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/438155 PREDICTION AND MEASUREMENT OF UMBILICAL BEHAVIOUR DURING LAYING PROCEDURES https://trid.trb.org/View/449805 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/449805 CABLE SHIP TO MAINTAIN MEDITERRANEAN LINKS https://trid.trb.org/View/443551 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/443551 THE DEPLOYMENT OF AN UNDERSEA CABLE SYSTEM IN SHEARED CURRENT https://trid.trb.org/View/449810 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/449810 SOVEREIGN https://trid.trb.org/View/440137 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/440137 CABLE SHIP SOVEREIGN https://trid.trb.org/View/440812 Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/440812 THE CABLE-LAYING SHIPS LEON-THEVENIN AND RAYMOND-CROZE BUILT AT HAVRE AND AT A ROCHELLE-PALLICE FOR THE FRENCH SUBMARINE CABLE COMPANY https://trid.trb.org/View/418031 6.25m; Depth, to deck E 11.6m, to deck D 9m, to deck C 6.3m; Load displacement 6,830 t; Deadweight 2,900 t. Classification is according to Bureau Veritas 1.3/3 E open sea, cabel-ship ice III RMCV . Power for the ships' Diesel-electric propulsion is supplied by three groups of diesel generators, each comprising a Crepelle diesel engine rated at 1,900 hp at 750 rpm and a tri-phase alternator of type PA 100 G 90 P supplying 1,500 kVA. Cable is carried in five cylindrical containers of 12.5m diameter, with a total capacity of 1,063 cu m.]]> Mon, 14 Aug 1995 00:00:00 GMT https://trid.trb.org/View/418031