Transport Research International Documentation (TRID) https://trid.trb.org/ en-us Copyright © 2024. National Academy of Sciences. All rights reserved. http://blogs.law.harvard.edu/tech/rss tris-trb@nas.edu (Bill McLeod) tris-trb@nas.edu (Bill McLeod) Transport Research International Documentation (TRID) https://trid.trb.org/Images/PageHeader-wTitle.jpg https://trid.trb.org/ BALLAST PERFORMANCE: CONSIDERING MORE KEY FACTORS https://trid.trb.org/View/539713 Wed, 14 Oct 1998 00:00:00 GMT https://trid.trb.org/View/539713 MATERIALS FOR TRACK BALLAST https://trid.trb.org/View/11326 Sun, 04 Dec 1994 00:00:00 GMT https://trid.trb.org/View/11326 TRACK LOADING FUNDAMENTALS--4 CURVED TRACK AND LATERAL STRENGTH https://trid.trb.org/View/6494 Sun, 04 Dec 1994 00:00:00 GMT https://trid.trb.org/View/6494 BLANKETING OF TRACK, SOUTHERN RAILWAY https://trid.trb.org/View/6915 Sun, 04 Dec 1994 00:00:00 GMT https://trid.trb.org/View/6915 TRACK LOADING FUNDAMENTALS--3 DETERMINATION OF BALLAST DEPTH https://trid.trb.org/View/6493 Sun, 04 Dec 1994 00:00:00 GMT https://trid.trb.org/View/6493 REVIEW OF A RUSSIAN ARTICLE CONCERNING THEIR APPROACH TO TRACK DESIGN AND MAINTENANCE https://trid.trb.org/View/11597 Fri, 08 Jul 1994 00:00:00 GMT https://trid.trb.org/View/11597 RECOMMENDATIONS ON NUMBER AND PLACING OF ANTI-CREEPERS FOR VARIOUS CONDITIONS https://trid.trb.org/View/5022 Fri, 08 Jul 1994 00:00:00 GMT https://trid.trb.org/View/5022 ASSESSMENT OF DESIGN TOOLS AND CRITERIA FOR URBAN RAIL TRACK STRUCTURES. VOLUME I. AT-GRADE TIE-BALLAST TRACK https://trid.trb.org/View/17611 Thu, 12 Nov 1981 00:00:00 GMT https://trid.trb.org/View/17611 PARAMETRIC STUDY OF TRACK RESPONSE https://trid.trb.org/View/148084 Tue, 22 Apr 1980 00:00:00 GMT https://trid.trb.org/View/148084 POSTMORTEM INVESTIGATION OF THE KANSAS TEST TRACK, VOLUME I https://trid.trb.org/View/144795 Mon, 11 Feb 1980 00:00:00 GMT https://trid.trb.org/View/144795 INVESTIGATION OF A PLATE INDEX TEST FOR RAILROAD BALLAST https://trid.trb.org/View/147595 Mon, 11 Feb 1980 00:00:00 GMT https://trid.trb.org/View/147595 MATCHING M/W PRACTICE TO REQUIRED USE OF TRACK--PART II: TIES AND BALLAST https://trid.trb.org/View/146655 Tue, 15 Jan 1980 00:00:00 GMT https://trid.trb.org/View/146655 UNDERCUTTING OF TRACK https://trid.trb.org/View/141310 Wed, 17 Oct 1979 00:00:00 GMT https://trid.trb.org/View/141310 DEVELOPMENT OF MULTILAYER ANALYSIS MODEL FOR TIE-BALLAST TRACK STRUCTURES https://trid.trb.org/View/141398 Sat, 29 Sep 1979 00:00:00 GMT https://trid.trb.org/View/141398 ADAPTING THE BALLAST BED FOR VERY HIGH SPEED https://trid.trb.org/View/85266 Wed, 13 Jun 1979 00:00:00 GMT https://trid.trb.org/View/85266