Evaluating Wisconsin Warranty Projects: Before, During and After the Warranty (With Discussion)

This paper is the third in a series on the Wisconsin hot-mix asphalt (HMA) warranty pavement experience. This paper is an update on the 24 projects previously covered in presentations in 1996 and 2001. The performance histories of all 55 warranty projects constructed through the end of 2003 are tracked from their construction date to the present. This data included all the projects that have passed their 5-year warranty periods. The background on development of Quality Control specifications in Wisconsin is presented to aid in explaining how the Warranty specification in Wisconsin has extended pavement life, improved quality and reduced costs. Future directions of the warranty specification are discussed.

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01020743
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Mar 27 2006 11:07AM