SUBSIDENCE AND SOIL REINFORCEMENT ON LINE 8, EXTENSION MADRID METRO

This paper describes the construction methods used during the drilling of the tunnel for the Extension of Line 8 of the Madrid Metro (2000-2001), section Mar de Cristal - Nuevos Ministerios, along with the procedures used for estimating the induced subsidence and the ground treatment carried out during the construction in order to protect nearby buildings. Finally, a comparison is made of the theoretical and real results obtained in some specific cases.

Language

  • English

Media Info

  • Features: Figures; References;
  • Pagination: p. 277-282

Subject/Index Terms

Filing Info

  • Accession Number: 00930490
  • Record Type: Publication
  • ISBN: 3000091696
  • Files: TRIS
  • Created Date: Sep 5 2002 12:00AM