REPLACEMENT OF TURNOUTS ON THE SHINKANSEN TRACK (TOKAIDO)

As part of the rehabilitation of the New Tokaido Line, all 123 turnouts are to be replaced by 1981 with units incorporating the heavier rails being installed throughout the route. The line is shut down entirely during periods of slack traffic for these changeouts. The procedures and equipment used to achieve the scheduled replacements are described.

  • Corporate Authors:

    Japan Railway Civil Engineering Association

    Kyodo Building, 18-7 Hagashi-Uyeno 2 Chome, Daito-Ku
    Tokyo-110,   Japan 
  • Authors:
    • Tanaka, H
    • Otsuka, C
    • Hori, R
    • Kamezawa, K
  • Publication Date: 1977-4

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: p. 14-30
  • Serial:
    • Permanent Way
    • Volume: 18
    • Issue Number: 3
    • Publisher: Japan Railway Civil Engineering Association

Subject/Index Terms

Filing Info

  • Accession Number: 00165071
  • Record Type: Publication
  • Report/Paper Numbers: No. 68
  • Files: TRIS
  • Created Date: Nov 23 1977 12:00AM