PIPEJACKING IN WATER-SATURATED GROUND . TUNNEL CONSTRUCTION 90. PAPERS PRESENTED AT THE TUNNEL CONSTRUCTION 90 CONFERENCE, ORGANIZED BY THE INSTITUTION OF MINING AND METALLURGY, LONDON, 3-4 APRIL, 1990

This article describes the construction of utility and waste tunnels in water saturated ground using the hydraulic pipe jacking method. Special attention is given to: methods of ensuring the stability of the face when jacking in loose soil; the problems of blowout, and how to be forewarned of such an occurrence and the immediate countermeasures to enforce to prevent one; problems of working using compressed air; factors of importance for following curved alignments; and methods of sealing joints. For the covering abstract of the conference see IRRD 828810.

  • Availability:
  • Corporate Authors:

    Institution of Mining & Metallurgy

    44 Portland Place
    London W1N 4BR,   England 
  • Authors:
    • Nussbaumer, M
  • Publication Date: 1990

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00604997
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • ISBN: 1-870706-17-X
  • Files: ITRD, TRIS
  • Created Date: Feb 28 1991 12:00AM