SEEPAGE CONTROL DURING TUNNEL DRIVING UNDER LAKE HURON. LARGE ROCK CAVERNS - PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM, HELSINKI, FINLAND, 25-28 AUGUST 1986. VOLUME 1
The objective of this paper is to provide a case history on rock tunnelling beneath Lake Huron, Ontario, Canada. The project under review consisted of the construction of an 8.7 m diameter cooling water intake tunnel for the Bruce B nuclear generating station owned and operated by Ontario Hydro. Continuous consolidation grouting of the tunnel was carried out to control water inflow during excavation. A summary of design parameters and construction procedures is given. For the covering abstract of the symposium see IRRD 810647. (Author/TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0080340784
-
Corporate Authors:
Pergamon Press, Incorporated
Headington Hill Hall
Oxford OX30BW, -
Authors:
- Lukajic, R
- Azis, I
- Mansson, L
- Publication Date: 1987
Media Info
- Features: References;
- Pagination: p. 355-365
-
Serial:
- Publication of: Pergamon Press Limited
- Publisher: Pergamon Press, Incorporated
Subject/Index Terms
- TRT Terms: Case studies; Conferences; Construction management; Grouting; Lakes; Prevention; Rocks; Seepage; Structural design; Tunneling; Tunnels
- Uncontrolled Terms: Tunnel design
- Geographic Terms: Ontario (Province)
- Old TRIS Terms: Rock tunneling
- ITRD Terms: 8018: Canada; 8525: Conference; 5155: Excavation (process); 3617: Injection (mater); 9149: Prevention; 4154: Rock; 4315: Seepage; 3394: Shield driving; 3605: Timbering; 3374: Tunnel
- Subject Areas: Bridges and other structures; Construction; Geotechnology; Highways; Hydraulics and Hydrology; Security and Emergencies;
Filing Info
- Accession Number: 00476282
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- ISBN: 0-08-034078-4
- Files: ITRD, TRIS
- Created Date: Sep 30 1988 12:00AM