SEEPAGE CONTROL DURING TUNNEL DRIVING UNDER LAKE HURON. LARGE ROCK CAVERNS - PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM, HELSINKI, FINLAND, 25-28 AUGUST 1986. VOLUME 1

The objective of this paper is to provide a case history on rock tunnelling beneath Lake Huron, Ontario, Canada. The project under review consisted of the construction of an 8.7 m diameter cooling water intake tunnel for the Bruce B nuclear generating station owned and operated by Ontario Hydro. Continuous consolidation grouting of the tunnel was carried out to control water inflow during excavation. A summary of design parameters and construction procedures is given. For the covering abstract of the symposium see IRRD 810647. (Author/TRRL)

  • Availability:
  • Corporate Authors:

    Pergamon Press, Incorporated

    Headington Hill Hall
    Oxford OX30BW,    
  • Authors:
    • Lukajic, R
    • Azis, I
    • Mansson, L
  • Publication Date: 1987

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00476282
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • ISBN: 0-08-034078-4
  • Files: ITRD, TRIS
  • Created Date: Sep 30 1988 12:00AM