DESIGN & INSTALLATION OF SPECIAL TUNNEL RINGS TO MONITOR LONG TERM GROUND LOADING
In conjunction with a government/industry-sponsored research project to record long-term subsurface movements at two locations on the alignment of the Jubilee Line Extension running tunnels, it is proposed to install four special tunnel rings to provide additional information on the loadings to the tunnel linings due to both short- and long-term ground movements. For the covering abstract see ITRD E116463.
-
Corporate Authors:
City University (London, England). Dept. of Electrical, Electronic and Information Engineering
, -
Authors:
- DAVIES, H R
- BOWERS, K H
- Publication Date: 1996
Language
- English
Media Info
- Features: References;
- Pagination: p. 197-201
-
Serial:
- GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND - PREPRINT VOLUME OF PROCEEDINGS FROM AN INTERNATIONAL SYMPOSIUM HELD AT CITY UNIVERSITY, LONDON, UK, 15-17 APRIL 1996
- Publisher: City University (London, England). Dept. of Electrical, Electronic and Information Engineering
Subject/Index Terms
- TRT Terms: Conferences; Construction; Ground settlement; Time duration; Tunnel lining; Tunnels
- Uncontrolled Terms: Long term
- ITRD Terms: 8525: Conference; 3655: Construction; 9110: Long term; 5792: Settlement; 3374: Tunnel; 3385: Tunnel lining
- Subject Areas: Bridges and other structures; Construction;
Filing Info
- Accession Number: 00940244
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD
- Created Date: Apr 4 2003 12:00AM