AUTOMATIC HYPERBARIC WELDING FOR NORTH ALWYN PIPELINE CONNECTION
Details are given of the design, operation and commissioning of the THOR-1 automatic orbital TIG welding system for use in the North Sea. After a trial weld, a production tie-in weld was made on a 24m diameter API 5L X65 linepipe at water depth 130m. This article describes the system layout of THOR-1, which, following its successful application in the Alwyn North project in July 1986, is now considered to be fully operational. The ultimate aim of the THOR-1 programme is the development of a diverless pipeline repair and tie-in system. Work has now started on such a system which is scheduled for testing in Autumn 1988.
-
Supplemental Notes:
- Metal Construction, 19 (1987), p. 377 (July) [4 pp., 3 ref., 3 fig., 4 phot.]
-
Authors:
- Blight, J
- Hutt, G
- Publication Date: 1987
Language
- English
Subject/Index Terms
- Subject Areas: Marine Transportation;
Filing Info
- Accession Number: 00692204
- Record Type: Publication
- Source Agency: British Maritime Technology
- Files: TRIS
- Created Date: Aug 14 1995 12:00AM