VIADUC SUR LA LOIRE - AUTOROUTE A72
L'ARTICLE PRESENTE LE VIADUC SUR LA LOIRE DE L'AUTOROUTE A72 A HAUTEUR D'ANDREZIEUX-BOUTHEON, CONSTRUIT SELON LA TECHNIQUE DU PONT POUSSE. SONT PRESENTEES SUCCESSIVEMENT: LA CONCEPTION GENERALE DU TABLIER (POUTRE CAISSON EN BETON PRECONTRAINT DE 12 TRAVEES) ; CERTAINES INNOVATIONS COMME LA CONSTRUCTION D'UN GUE PENDANT LES TRAVAUX POUR PERMETTRE L'ACCES AUX PILES DU LIT MINEUR ET FACILITER LES TERRASSEMENTS DE LA SECTION AUTOROUTIERE, OU LA MISE EN PLACE D'UNE BARRIERE DE SECURITE BN3 D'UNE LONGUEUR EXCEPTIONNELLE; L'EXECUTION DES TRAVAUX. EN ANNEXE SONT DONNES LES MOMENTS HYPERSTATIQUES DE PRECONTRAINTE DANS UN CABLAGE DE POUSSAGE.
-
Authors:
- BERNIER, D
- CHOISET, P
- LASAUNIERE, M
- MAURIN, J
- PALACCI, A
- RAVIX, J -
- Publication Date: 1984-10
Language
- French
Media Info
- Pagination: 30-42
-
Serial:
- Travaux
- Issue Number: 592
- Publisher: Federation Nationale des Trav Publ & des Synd Aff
Subject/Index Terms
- TRT Terms: Box girders; Bridge decks; Bridges; Construction; Freeways; Inland waterways; Launching; Prestressed concrete
- Geographic Terms: France
- ITRD Terms: A72; APPUI DE PONT ; 2752: Autoroute; 4796: Beton precontraint; 3655: Construction (execution); 1088: Fleuve; 8036: France; LOIRE; 3412: Poussage (pont); 3474: Poutre caisson; 3482: Tablier de pont; 3455: Viaduc
- Subject Areas: Bridges and other structures; Construction; Marine Transportation; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01273456
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 20 2010 4:37PM